# When IT and a partner share selection, who do you reach first?

- Page: https://panelhop.com/blog/shared-software-selection-who-to-reach-first
- Publisher: Panelhop (https://panelhop.com/)

> **The short answer:** Reach first the person who runs the selection, usually the IT subsidiary’s demand or architecture lead. Reach the partner’s delivery lead second, then meet the sponsor with both in the room. Before any call, map the buying group across all 3 organisations, and track engaged roles, not contacts, so a one-sided deal shows as stalling.

Published 9 November 2026 · By Saksham Baliyan, Co-founder

## Key numbers

- **50%** of the influence over vendor choice sits with hidden buyers such as IT and procurement. Source: [Bain & Company, 2026](https://www.bain.com/insights/raising-the-odds-on-a-deal-how-likelihood-to-buy-rewires-b2b-growth/).
- **51%** of insurtech ratings score carriers’ business and IT alignment 4 or lower out of 7. Source: [Alvarez & Marsal and InsurTech NY, 2026](https://www.insurtechny.com/wp-content/uploads/2026/04/AM_480341_FSIG_Joint-InsurTech-NY-research-Paper.pdf).
- **+130%** average win-rate lift from multi-threading in deals over $50k. Source: [Gong, 2025](https://www.gong.io/blog/data-shows-top-reps-dont-just-sell-they-orchestrate-with-ai).
- **10–16** people decide at an insurance carrier, by Panelhop’s estimate. Source: [Panelhop, 2026](https://panelhop.com/industries/insurance/).

## Who do we reach first? Whoever runs the selection

Reach first the person who runs the selection: the one who sets the evaluation steps, the criteria and the shortlist. When business units buy software through a group IT subsidiary, that is usually a demand manager or an enterprise architect there. Reach the outside partner’s delivery lead second, in the same fortnight. Meet the sponsor third, with both of them in the room.

You can learn who runs the selection without the meeting the sponsor refused. Send the sponsor 2 questions in writing: who runs the evaluation at IT, and what will the partner do? Add one line on why you ask: you will prepare with both, so the sponsor’s time goes on the decision.

The answer about the partner sets its place in the order. It may integrate the system, run it under contract or sell a product of its own. The partner goes first only when it runs the selection itself, for example when it operates the application under an outsourcing contract and sets the technical evaluation. Otherwise a partner approached first may read you as a threat to its own work. The IT subsidiary may read the same call as going around it. Ask the IT lead to introduce you to the partner instead.

Don’t reach both with one email either. The IT lead wants to see how you fit the architecture and what due diligence you can hand over. The partner’s lead wants to know what work you create or remove for its team. Each needs its own first conversation.

Both sit in the selection for a reason. A buyer can buy a product, build in-house or have a partner adapt one, and each option changes the work of IT and the partner. Regulated buyers add a legal reason. In the EU, DORA requires banks and insurers to do due diligence on a prospective ICT provider throughout selection, before they sign. ([Official Journal of the European Union, 2022](https://eur-lex.europa.eu/eli/reg/2022/2554/oj))

- **01. Step 1: Map the buying group** Write every role across the business unit, the IT subsidiary and the partner, with who on your team engages each and by when. (Before any call)
- **02. Step 2: Ask the sponsor 2 questions in writing** Who runs the selection at IT? What will the partner do: integrate, run the system or sell its own product? (Week 1)
- **03. Step 3: Meet whoever runs the selection** Learn the evaluation path and the documents due diligence needs, then ask for an introduction to the partner. (Week 2)
- **04. Step 4: Meet the partner’s delivery lead** Agree the partner’s role and what it is paid for, and check it doesn’t sell a competing product. (Weeks 2–3)
- **05. Step 5: Start the security review** Send audit reports, the subcontractor list and an exit plan, so the review runs beside the evaluation. (Week 3)
- **06. Step 6: Hold the first joint meeting** The sponsor, whoever runs the selection and the partner agree the problem, the path, the decision rights and the dates. (Week 4)

The weeks in these steps are an illustration. Set yours from your own sales cycle.

## A sponsor who won’t meet alone names the buying group

We think a sponsor who won’t meet without IT and the partner is telling you who decides. That is the buying group, handed to you early. Treat it as an obstacle and you lose the one person who could tell you the order.

The research points the same way. Bain and LinkedIn found that hidden buyers such as procurement, finance and IT hold half of the influence over the vendor choice. ([Bain & Company, 2026](https://www.bain.com/insights/raising-the-odds-on-a-deal-how-likelihood-to-buy-rewires-b2b-growth/)) In a 2026 survey of insurtech leaders rating their work with carriers, 51% of responses scored business and IT alignment 4 or lower out of 7. ([Alvarez & Marsal and InsurTech NY, 2026](https://www.insurtechny.com/wp-content/uploads/2026/04/AM_480341_FSIG_Joint-InsurTech-NY-research-Paper.pdf)) Executive sponsorship scored that low in only 22%. ([Alvarez & Marsal and InsurTech NY, 2026](https://www.insurtechny.com/wp-content/uploads/2026/04/AM_480341_FSIG_Joint-InsurTech-NY-research-Paper.pdf))

**Exhibit 1: Insurtech leaders rate carriers low on business and IT alignment more than twice as often as on executive sponsorship.**

| Item | Value |
|---|---|
| Due diligence | 58% |
| Business and IT alignment | 51% |
| Budget and funding | 48% |
| Decision-making | 46% |
| Issue resolution | 42% |
| Definition of success | 41% |
| Resources | 40% |
| Executive sponsorship | 22% |

Source: Alvarez & Marsal and InsurTech NY, From Experimentation to Execution Discipline (2026). Share of 155 insurtech responses rating their partnerships with carriers 4 or lower on a 1–7 scale.

We hold the view for 3 reasons. First, a sponsor who can’t sign alone can only give you a verbal yes, and IT and the partner reopen it later, when you have less time. Second, routing around them turns reviewers into blockers, who can slow a deal without ever saying no. Third, multi-threading happens reliably only when the plan names who talks to whom and by when. Left to the sponsor, the IT and partner meetings happen when someone finds the time.

Gong’s analysis of 1.8M deals found that multi-threading lifts win rates by 130% on average in deals over $50k. ([Gong, 2025](https://www.gong.io/blog/data-shows-top-reps-dont-just-sell-they-orchestrate-with-ai)) That doesn’t mean every person in the buying group needs equal attention. In our view, the roles that matter to this decision do, and the plan should name them.

## Map one buying group across 3 organisations

Before you contact anyone, put the business unit, the IT subsidiary and the partner into one buying-group map. For each role, write who holds it, what they care about, what they need from you, who on your team engages them and by when. Mark the roles you can’t name yet. Your first conversations should fill those gaps.

| Role | Sits in | Cares about | Needs from you | Who engages, by when |
|---|---|---|---|---|
| Business sponsor | Business unit | The problem, in their own numbers | A business case they can defend | Account executive, at the joint meeting in week 4 |
| Whoever runs the selection: a demand manager or an architect | IT subsidiary | Fit with the architecture and IT’s workload | The integration design and the evaluation path | Account executive and solutions engineer, week 2 |
| Security and third-party risk | The buyer or its group | Due diligence before any contract | Audit reports, the subcontractor list and an exit plan | Solutions engineer, week 3 |
| Delivery lead | Outside IT partner | Its role and revenue in the change | A defined part in the integration or the run | Account executive or partner manager, weeks 2–3 |
| Procurement | The group | A documented, competitive process | Comparable prices and contract terms | Account executive through the sponsor, before the shortlist |
| Employee representatives, where they have a say | The employer | What the tool records about staff | A plain account of the data it keeps on users | The sponsor with your input, before any pilot |

Write what each role needs in that person’s words. The architect asks how you connect to the systems already installed. Security asks for current audit reports and the list of your subcontractors. The partner asks what changes in its contract and its workload. The sponsor asks what the problem costs and when it stops.

The partner’s stake depends on how it earns. A reseller earns on licences, so your product may compete with one it sells. An integrator earns on project days, so your product is work for its team. An operator carries the service levels, so it asks who fixes what when something breaks. Write that stake into the map, because it decides what the partner needs from you.

Pair people across the 2 sides on purpose. Your solutions engineer meets the architect. Your account executive meets the sponsor and whoever runs the selection. If the partner has a partner manager, match them with yours.

Size the map to the deal. A small tool may need the sponsor, the selection owner and security. A core system replacement needs every row in the table and more. Then put a date against every role. A role with no date is a hope, and a hope never shows up in a pipeline review.

## What should the first meeting with the buying group decide?

The first joint meeting should settle 5 things in writing: the problem, the evaluation path, the decision rights, the partner’s role and the dates. Agree them in advance with whoever runs the selection and the partner’s lead, so the meeting confirms what the pre-meetings found instead of discovering it.

- The problem and its cost, in the sponsor’s numbers
- The evaluation path: the steps, the documents and who reviews each
- The decision rights: who recommends, who approves the architecture, who funds and who signs
- The partner’s role: integration, operation or neither, and what it is paid for
- The dates of each step, the security review and procurement included

Send the 5 points as a one-page agenda a week ahead, and ask each participant to add what is missing. If the meeting ends without dates, it was an introduction, and the deal hasn’t moved.

Start the security review in the same week, not after a verbal yes. At regulated buyers the review is slow: by Panelhop’s estimate, a security review at an insurance carrier takes 1–3 months. ([Panelhop, 2026](https://panelhop.com/industries/insurance/)) If the review runs beside the evaluation, those months overlap with work already under way. If it runs after, they add straight to the sales cycle.

## Keep the deal from stalling: count engaged roles

Count progress as engaged roles out of the roles that matter, and a stall shows weeks before the close date slips. Contacts reached is the wrong count. A rep can reach 9 people at the IT subsidiary and the partner and still have 1 engaged role. ([Panelhop, 2026](https://panelhop.com/blog/shared-software-selection-who-to-reach-first#who-goes-first-when-selling-software-to-a-german-insurer))

Engaged means a two-way exchange in the last 30 days in which the person said what they need or agreed a dated next step. An email open, webinar attendance or a connection request doesn’t count.

Write 3 numbers on every opportunity: roles that matter, roles engaged and organisations engaged. Then apply 3 stall rules.

1. **One-sided.** Every engaged role sits in one organisation, usually the one you met first.
2. **Flat.** The number of engaged roles hasn’t moved in 21 days, our default. Pick a window that fits your sales cycle.
3. **Unprepared.** A joint meeting is booked before whoever runs the selection and the partner’s lead have each had their own conversation.

Any one of them marks the deal as stalling in the pipeline review, whatever stage the CRM shows. The fix is a dated meeting with a missing role. Another email to the roles already engaged changes nothing. Review the 3 numbers deal by deal in every pipeline review, before anyone discusses the stage.

We think a deal with 1 engaged role isn’t yet a qualified opportunity, however keen that person is. The sponsor’s interest is real. The decision just isn’t one the sponsor can make alone.

## Who goes first when selling software to a German insurer?

In this worked example, the IT subsidiary’s demand manager goes first, the partner’s delivery lead second and the head of claims third, with both in the room. It is an illustration: the vendor, the insurer, the deal and its dates are fictional, made up to show the method. A vendor sells claims document intake software at about €150k a year. ([Panelhop, 2026](https://panelhop.com/blog/shared-software-selection-who-to-reach-first#who-goes-first-when-selling-software-to-a-german-insurer)) The target is a mid-size German property and casualty insurer whose head of claims won’t meet without the group’s IT subsidiary and the outside partner that runs the claims platform.

The vendor maps 7 roles that matter. ([Panelhop, 2026](https://panelhop.com/blog/shared-software-selection-who-to-reach-first#who-goes-first-when-selling-software-to-a-german-insurer)) At the insurer: the head of claims, the third-party risk officer, group procurement and the works council. At the IT subsidiary: the demand manager for claims and an enterprise architect. At the partner: the delivery lead. The works council is on the list because the tool logs claims handlers’ work, and German works councils can veto a tool that monitors staff. ([Panelhop, 2026](https://panelhop.com/industries/insurance/)) By Panelhop’s estimate, 10–16 people decide at a carrier, so 7 roles is a floor. ([Panelhop, 2026](https://panelhop.com/industries/insurance/))

The head of claims answers the 2 questions by email in week 1: the demand manager runs the selection, and the partner runs the claims platform under contract with no intake product of its own. That sets the order.

| Week (illustration) | Newly engaged | Engaged roles | Organisations engaged | Reading |
|---|---|---|---|---|
| 0 | Head of claims, by email | 1 of 7 (14%) | 1 of 3 | Start: plan the meetings at IT and the partner |
| 1 | None: the head of claims answers the 2 questions | 1 of 7 (14%) | 1 of 3 | Order set |
| 2 | Demand manager at the IT subsidiary | 2 of 7 (29%) | 2 of 3 | Moving |
| 3 | Partner’s delivery lead, enterprise architect, third-party risk officer | 5 of 7 (71%) | 3 of 3 | Ready for the joint meeting |
| 4 | None: joint meeting held, dates agreed | 5 of 7 (71%) | 3 of 3 | Procurement and works council dated |
| 8 | Group procurement, works council | 7 of 7 (100%) | 3 of 3 | Evaluation runs on its dates |
| 6, routed around | Enterprise architect only, after 9 contacts reached | 1 of 7 (14%) | 1 of 3 | Stalling: one-sided and flat |

Coverage is engaged roles divided by 7: 1 ÷ 7 is 14%, 2 ÷ 7 is 29%, 5 ÷ 7 is 71% and 7 ÷ 7 is 100%. ([Panelhop, 2026](https://panelhop.com/blog/shared-software-selection-who-to-reach-first#who-goes-first-when-selling-software-to-a-german-insurer)) The routed-around version of the same deal reaches 9 contacts by week 6 but engages only the architect, at 14%. ([Panelhop, 2026](https://panelhop.com/blog/shared-software-selection-who-to-reach-first#who-goes-first-when-selling-software-to-a-german-insurer)) It is one-sided and flat, yet a contact count would show it as the busier deal.

The same map answers US underwriting AI vendors whose buyers’ boards want pilots in production. Board pressure moves the signature to the business line that runs the model, often the COO or chief underwriting officer. ([Panelhop, 2026](https://panelhop.com/industries/insurance/)) The NAIC model bulletin also puts an insurer’s AI strategy with senior management accountable to the board, and it covers AI bought from vendors. ([National Association of Insurance Commissioners, 2023](https://content.naic.org/sites/default/files/inline-files/2023-12-4%20Model%20Bulletin_Adopted_0.pdf)) Add those roles to the map with dates, and keep the innovation team as your champion.

## How we do it at Panelhop

Panelhop is an account-based marketing (ABM) and GTM consultancy for B2B companies selling deals of €25k or more. We map the buying group for each target account: the roles that matter across the business, IT and any outside partner, and which of them your team has engaged. A Panel Check (GTM audit · 2–3 weeks) scores your go-to-market from your own CRM data, buying-group engagement included, and shows where pipeline leaks.

Leak Fix (we build the fixes) has a buying-group coverage module: every role mapped and tracked in your CRM, missing roles found and coverage shown on every account. Signal Desk (in-market accounts, weekly) puts in-market accounts into your CRM with a fit score, a buying-group map and a reviewed brief. We don’t send volume cold email. Your reps own the first touch.

## Questions buyers ask about this

### Should we reach the outside IT partner before the group IT subsidiary?

Only when the partner runs the selection, for example when it operates the application under contract and sets the technical evaluation. Otherwise start with the IT subsidiary and ask it to introduce you to the partner, so the partner meets you as part of the process rather than as a threat to its work.

### What if the outside IT partner sells a competing product?

Find out before the first joint meeting by asking the sponsor or the IT subsidiary what the partner does there. Offer the partner paid work around your product, such as the integration, and ask for written evaluation criteria at the joint meeting so the comparison runs on the sponsor’s numbers. If it still steers against you, raise it with whoever runs the selection at IT.

### What counts as an engaged member of the buying group?

Someone who has had a two-way exchange with your team in the last 30 days and said what they need or agreed a dated next step. Email opens, webinar attendance and connection requests don’t count. Track it by role, so a deal with many contacts and 1 engaged role shows as thin.

### How do we keep the business sponsor involved while IT runs the evaluation?

Give the sponsor dated decisions in the plan: approving the evaluation criteria at the joint meeting and the business case before the shortlist. Send a short written update after each IT and partner meeting, so the sponsor never hears about progress second-hand.

### Boards at US carriers are pushing AI pilots into production. Should we sell underwriting AI to the COO instead of the innovation team?

Sell to both, with different jobs. Production is usually paid by the business line that runs the model, often the COO or chief underwriting officer, and the NAIC model bulletin puts an insurer’s AI strategy with senior management accountable to the board. Keep the innovation team as your champion and add the COO, underwriting and AI governance to the plan, with dates, before the pilot ends.

## Sources

1. [Raising the Odds on a Deal: How Likelihood to Buy Rewires B2B Growth](https://www.bain.com/insights/raising-the-odds-on-a-deal-how-likelihood-to-buy-rewires-b2b-growth/): Bain & Company, 2026
2. [From Experimentation to Execution Discipline: How Leading Insurers Are Converting Insurtech Partnerships into Measurable Returns](https://www.insurtechny.com/wp-content/uploads/2026/04/AM_480341_FSIG_Joint-InsurTech-NY-research-Paper.pdf): Alvarez & Marsal and InsurTech NY, 2026
3. [Gong, 2025 analysis of 1.8M deals](https://www.gong.io/blog/data-shows-top-reps-dont-just-sell-they-orchestrate-with-ai): Gong, 2025
4. [NAIC Model Bulletin: Use of Artificial Intelligence Systems by Insurers](https://content.naic.org/sites/default/files/inline-files/2023-12-4%20Model%20Bulletin_Adopted_0.pdf): National Association of Insurance Commissioners, 2023
5. [How do software vendors sell to insurance carriers, MGAs and brokers?](https://panelhop.com/industries/insurance/): Panelhop, 2026
6. [Regulation (EU) 2022/2554 on digital operational resilience for the financial sector (DORA)](https://eur-lex.europa.eu/eli/reg/2022/2554/oj): Official Journal of the European Union, 2022
7. [Worked example of a buying group plan for shared software selection at a German insurer, Illustrative](https://panelhop.com/blog/shared-software-selection-who-to-reach-first#who-goes-first-when-selling-software-to-a-german-insurer): Panelhop, 2026
