Who to bring in before a pilot starts: the longest review first

Before a pilot starts, bring in the buying group in order of review length, longest first, and date each review back from the production decision.

+55%

higher win rates when decision makers were involved in the first 2 stages

Ebsta x Pavilion, 2025
+130%

average win-rate lift from multi-threading on deals over $50k

Gong, 2025
55%

of US bank leaders say their bank updated vendor due diligence for AI risks

Bank Director, 2026
9 of 20

banking vendors in our October 2026 analysis are likely to stall on late due diligence

Panelhop, 2026

Why does a pilot that worked freeze when risk arrives?

A pilot that worked proves the product to its sponsor, but production waits on reviews the pilot never started. Each review has its own owner, queue and evidence list: the security review at a hospital, supplier qualification at a pharma plant, model validation at a bank or an insurer. None of those owners reports to your sponsor. Start their review at the readout and its whole length lands on your sales cycle.

Many of these reviews are written to finish before first use, and production is the first use. At a bank, for one, a vendor’s model is validated like the bank’s own, and validation “generally occurs prior to a model’s first use”↗. A review that starts when the pilot ends can only finish after it, however well the pilot went. The deal’s critical path runs through its slowest review.

In the deal that froze, model risk wasn’t hidden: the sponsor knew the review existed but not how long it would take, and nobody on your side owned it. Forecasts miss for the same reason: the close date was set from the pilot’s end, while the real date sat at the end of the slowest review. Involving decision makers early pays: across 655,000 opportunities, win rates rose 55% when they were actively involved in the first 2 stages of the sales process↗.

We read the 2 AI answers to this question and the 3 pages our weekly AI-answer tracker found cited for it↗. Both answers move model risk to the start. But they are written as if you ran the buyer’s governance: set up an approval committee, mandate a steering committee charter. A vendor can do neither. One answer brings third-party risk in only “as needed”, and the other still cites guidance that was replaced in April 2026↗. Neither dates each review back from the production decision or names who on the vendor’s side owns it. The 3 cited pages are written for the banks themselves↗.

Who in the buying group do we bring in first?

Bring in first the reviewer whose review takes longest and holds up production, once any question that could end the deal outright is answered. Rank the buying group with 3 rules.

  1. Questions that can end the deal come first, in the first call. No access to the data you need, a contract that bars the integration, no budget this year: each ends the deal before a pilot could help. Find who owns that answer and get it from them before the demo.
  2. Then the longest reviews, before the pilot. Ask each review’s owner what a complete file holds and how long the review takes from it. Then count back from the production decision: start date = the date its pack closes − review length − slack for a queue you don’t control. The review with the earliest start is the one you bring in first.
  3. Then everyone else, by the date their input is needed. The budget owner’s business case goes in before the decision pack closes, and procurement and legal come in before terms.
  1. 01Step 1

    List every review production needs

    Ask the sponsor which review would start only after the pilot works, then add any security, procurement or legal review with its own queue.

  2. 02Step 2

    Ask each owner for the file and the length

    What a complete file holds, how long the review takes from it and who signs it off.

  3. 03Step 3

    Count back from the production decision

    Start date = the date the decision pack closes − the review’s length − slack for a queue you don’t control.

  4. 04Step 4

    Name an owner on your side

    Match by peer: a data scientist for model risk, a security lead for the questionnaire, the account executive for the budget owner and procurement.

  5. 05Step 5

    Bring them in by start date

    Questions that can end the deal go in the first call. Every reviewer is engaged before the pilot plan is signed, and each review starts on its date, the longest first.

Seniority doesn’t set the order. A CFO who approves at the end needs the business case only shortly before; a validator with a long queue needed the model before the pilot began. When 2 reviews take about as long, start the one that can stop the deal first. To find the reviews, ask the sponsor in the first or second meeting: “Which review would start only after the pilot works?” The answer names the reviewer, the queue and often the owner.

Give each review an owner on your side, matched by peer. A data scientist takes model risk, a security lead takes the security questionnaire and a product specialist takes compliance. The account executive keeps the sponsor, the budget owner and procurement. Each owner books the first meeting, agrees the evidence and keeps the dates.

The same arithmetic re-dates a deal that already froze. Ask each reviewer how long is left, count forward and set the close date from the slowest review.

Start the pilot only when the buying group is engaged

Make an engaged buying group a pilot entry criterion: sign the pilot plan only when every reviewer production needs is engaged. Engaged means a two-way exchange with the person in that role in the last 90 days: a call, a meeting or a written reply to a question you asked. A name in the CRM, an opened email or the sponsor’s account of a meeting doesn’t count.

Engaging before the pilot has a point: each reviewer says what their review needs, and the pilot plan is written to produce it. If model risk wants the model’s results set against the buyer’s own decisions, the pilot runs alongside them and logs both. If security wants its questionnaire answered before any data moves, the questionnaire goes first. If finance wants a baseline, it is measured before the pilot starts, so the result can be priced. The pilot then ends with the evidence each review asked for.

Write the plan down with the sponsor and share it with every reviewer: each review, its evidence, its owners on both sides and its dates, on a single page. A plan the buyer has seen is harder to skip than one only your CRM knows.

  • Every review production needs is listed, with the person who owns it at the buyer
  • Each of those people has had a two-way exchange with you in the last 90 days
  • Each review’s evidence is written into the pilot plan, so the pilot produces it
  • Each review has a start date counted back from the production decision
  • The review with the earliest start has begun
  • Each review has an owner on your side
  • The budget owner has confirmed the production decision date and the budget line

Put it in the CRM, or it won’t hold. Give each required role a field for its status (named, engaged, evidence agreed, review started, review done), its owner on your side and its start date. Block the move into the pilot stage until every required role reads engaged and the review with the earliest start has begun. Block nothing else: hard blocks on every field teach reps to type whatever passes.

A reviewer who won’t engage is an answer too. Ask the sponsor to open that door once, with a date. If it stays shut, the pilot waits, and the deal keeps one task: that introduction.

Then report 2 counts each week across open pilots: roles listed and roles engaged. The gap between them is the freeze you haven’t met yet.

Multi-threading has to be planned, not left to the sponsor

We think a pilot that freezes when an unseen reviewer arrives was never multi-threaded by design. The plan named a sponsor and a success metric. It didn’t say who talks to model risk, vendor management and the CFO, or by when.

Left to the sponsor, we think it rarely happens. Reps default to the contact they’re comfortable with, and a sponsor can’t be expected to know another function’s queue. In our view the fix is a plan, written before the pilot, that names each role, its owner on your side and its date.

Timing matters as much as coverage. A reviewer brought in after the pilot can only accept or reject what someone else chose to prove. Brought in before, the same person helps design the test.

Where it has been measured, the payoff is large. In Gong’s analysis of 1.8M deals, multi-threading lifted win rates by 130% on average on deals over $50k↗. That is vendor platform data and a correlation, so read it as a pattern in won deals rather than proof that more contacts win.

We also think one engaged sponsor doesn’t make a qualified pilot. A pilot asks the buyer for time, data and people. If the reviewers who decide production haven’t agreed what it must prove, it proves the wrong things.

We don’t say every contact in the buying group needs equal attention, or that multi-threading alone wins the deal. Only the roles the production decision waits on have to be engaged before the pilot starts.

How does the pre-pilot plan run at a bank?

At a bank, the CIO comes first, in the first call; the model risk and vendor management reviews start before the pilot; the CFO’s business case comes last. Each review starts on a date counted back from the production decision. In Panelhop’s October 2026 analysis of 20 banking vendors’ websites, 14 look likely to stall on core integration, 13 on board cadence and 9 on late due diligence↗. Each is our inference from what the vendors publish. AI adds a reviewer. In Bank Director’s 2026 survey, 59% of US bank leaders said their bank had appointed an executive or team for AI oversight↗. Vendor due diligence had been updated for AI risks at 55% of their banks↗. At a $3bn bank, the bank’s own policy sets model risk’s steps, since the 2026 US guidance is aimed mostly at banks above $30bn↗.

Exhibit 1

More than half of US banks have updated vendor due diligence for AI risks.

Source: Bank Director, 2026 Technology Survey (2026); 136 US bank leaders, June–July 2026, more than one answer allowed
Data behind this chart
ItemValue
Drafted an AI acceptable use policy88%
Educating staff on AI-enabled fraud74%
Appointed an executive or team for AI oversight59%
Updated vendor due diligence for AI risks55%

Take a fictional AI underwriting vendor and a fictional $3bn bank. The durations are illustrative, to replace with the bank’s own: a 12-week pilot; validation 20 weeks, vendor due diligence 16, security 6, fair lending 4 and the business case 3↗. A steering committee meets every 4 weeks, and its pack closes a week before↗. Weeks count from the pilot’s start. Last time, model risk first saw the model at the week-12 readout↗. Validation ended in week 32, a week after the pack for that week’s committee closed↗. Production waited for the week-36 meeting: 24 weeks after a pilot that worked↗.

Next time, every review is dated back from the week-20 committee, whose pack closes in week 19: start = 19 − length − 4 weeks’ slack↗. All 7 roles are engaged before the pilot plan is signed; only their review dates differ↗. Model risk reads the documentation and development data first and takes the pilot’s logged results as its performance evidence. Every review ends by week 15, and the decision moves from week 36 to week 20, 16 weeks earlier↗.

Role at the bank (illustrative)What its review needs from youOwner on your sideReview starts
Chief lending officer (sponsor and budget owner)The outcome metric, the production date and the budget lineAccount executiveBefore the pilot plan
CIOData from the core and the loan system, and a core contract that allows the integrationSolution architectFirst call
Head of model riskThe model’s conceptual soundness, design, development data and performanceData science leadWeek −5 (19 − 20 − 4)
Vendor managementA risk tier, an exit plan and answers on the AI for the due diligence fileAccount executive with the security leadWeek −1 (19 − 16 − 4)
Information securityA current SOC 2 Type II report, penetration test results and the subprocessor listSecurity leadWeek 9 (19 − 6 − 4)
Compliance (fair lending)Fair lending tests on the pilot’s decisions and an audit trailProduct specialistWeek 11 (19 − 4 − 4)
CFOThe return the board will see and the total cost, core-integration fees includedAccount executiveWeek 12 (19 − 3 − 4)

The regulators’ new statement doesn’t change that order. On 11 September 2026 the Fed, the FDIC and the OCC named 4 core-provider practices they will weigh in supervision, including excessive limits on integrating unaffiliated providers↗. That may make some community banks readier to buy outside their core. It doesn’t rewrite a signed contract, so the CIO’s question still comes first.

In practice

How we do it at Panelhop

Panelhop is an account-based marketing (ABM) and GTM consultancy for B2B companies selling deals of €25k or more. In a Panel Check (GTM audit · 2–3 weeks) we read the last 24 months of your won and lost deals and set the first meeting with each role in the buying group against the pilot’s start and the close date. That shows which reviews your pilots keep meeting after the readout, and how many weeks each one adds.

A Leak Fix (we build the fixes) then builds the role map and the pilot entry gate into your HubSpot or Salesforce: each required role’s status, its owner on your side and its start date, with a task when a required role is missing at a stage and a required reason for every close-date move. Panel Ops (we run it monthly) reports roles listed and roles engaged on each open pilot against the baseline the Panel Check set. For vendors selling to banks and credit unions, we start from the roles on our banking page.

Questions buyers ask about this

On our bank deals, who do we bring in first: the CIO, the CFO or vendor management?

The CIO first, in the first call, if your product needs data from the core, because the core contract may rule the integration out this year. Then vendor management and model risk, before the pilot, because their reviews are long and production waits on them. Bring in the CFO when the business case is written, before the committee pack closes.

Will community banks now buy outside their core, after regulators called out core providers?

Some may find it easier: in September 2026 the Fed, the FDIC and the OCC said supervisors will weigh contract terms that make it hard for a bank to seek an alternative core provider or supplementary services. That doesn’t rewrite a signed contract, so each bank’s CIO still knows what its contract allows and when it ends. Treat a bank’s new interest in buying outside its core as a buying signal to confirm with its CIO before it goes in the forecast.

How do we catch the core question in the first call so reps stop forecasting deals we can’t close this year?

Before booking the demo, ask what has to happen first, who owns that date, what the date rests on and whether the purchase waits for it. Then ask the CIO whether the core contract allows your integration, and from when. If the bank must convert or renegotiate first, keep the deal in discovery with a look-again date and out of this year’s forecast.

What if our sponsor won’t introduce us to model risk before the pilot?

Ask which review would start only after the pilot works: the answer usually names the reviewer and the queue. Offer the sponsor a short working session in which model risk sets the evidence the pilot must produce, which spares the sponsor a stalled readout. If the door stays shut, hold the pilot plan, because a pilot model risk hasn’t seen is the freeze you had last time.

Does the pilot itself need model validation before it starts?

Ask the bank’s head of model risk. The 2026 US guidance says validation generally comes before a model’s first use and is aimed mostly at banks above $30bn, so a $3bn bank’s own policy decides whether a pilot run alongside human decisions counts as use. Either way, agree before the pilot what validation will need from it.

Written by

Saksham Baliyan Co-founder

Published · LinkedIn

Next step

See where your own pipeline leaks.

A 30-minute scoping call. Then a fixed price.